本文已被:浏览 1886次 下载 2831次
Received:September 29, 2013 Revised:September 19, 2014
Received:September 29, 2013 Revised:September 19, 2014
中文摘要: 电网生产过程中对电网资源的管理精细化、规范化管理提出了进一步要求, 亟需建成国网公司电网横向和纵向的“一张网”. 以电网图数一体化建模为基础, 从多时态统一版本角度出发, 分析灵活的设备、拓扑以及图形版本管理的机制, 为电网资源的图数一致性与完整性提供了保障.
Abstract:In the production process of power grid, power grid resource management and standardized management have been put forward further requirements, it's need to build national network grid and horizontal and vertical into "ONE NET". This paper is based on the grid graph and data integration model, starting from the multi temporal unified version angle, analysising the management mechanism of flexible devices, topology and graph version, providing the safeguard for the power grid resource's graph and data consistency and integrity.
keywords: power grid model design temporal space Gis version
文章编号: 中图分类号: 文献标志码:
基金项目:
引用文本:
吴淑玮,闫训超,郭宝,郑浩泉.多时态统一电网模型.计算机系统应用,2015,24(2):244-247
WU Shu-Wei,YAN Xun-Chao,GUO-Bao,ZHENG Hao-Quan.Temporal Unified Power Grid Model.COMPUTER SYSTEMS APPLICATIONS,2015,24(2):244-247
吴淑玮,闫训超,郭宝,郑浩泉.多时态统一电网模型.计算机系统应用,2015,24(2):244-247
WU Shu-Wei,YAN Xun-Chao,GUO-Bao,ZHENG Hao-Quan.Temporal Unified Power Grid Model.COMPUTER SYSTEMS APPLICATIONS,2015,24(2):244-247