本文已被:浏览 1608次 下载 3359次
Received:February 10, 2014 Revised:March 26, 2014
Received:February 10, 2014 Revised:March 26, 2014
中文摘要: 为快速完成装备修理任务,根据装备战时基地级维修的特点,提出了战时基地级装备维修作业分工的数学模型,在多工种多任务维修作业分工问题的基础上给出了带时间窗口的维修作业分工问题求解方案. 根据该作业分工模型,利用遗传算法的特性,将问题背景与算法相融合,运用实例进行试验及分析. 试验结果表明,本文提出的方法能有效地解决装备战时基地级维修作业分工优化问题.
Abstract:In order to accomplish the task of the equipment repair, according to the distinguishing of depot-level maintenance of equipment in war, this paper proposes a mathematical model of the division of operations in wartime equipment maintenance. Based on many types of multi task repair operations division, it puts forwards repair operations division problem solving scheme with time window. According to the model, using the characteristics of genetic algorithm, integrating the background of the problem and algorithm, this paper tests and analyzes an instance. The results show that the proposed method can effectively solve the wartime maintenance operations and division of optimization problems.
文章编号: 中图分类号: 文献标志码:
基金项目:
引用文本:
凌海风,张军,张洋,彭永飞.装备战时基地级维修作业分工优化.计算机系统应用,2014,23(9):162-166
LING Hai-Feng,ZHANG Jun,ZHANG Yang,PENG Yong-Fei.Equipment in Wartime Depot-Level Maintenance Operations Optimization of Division of Labour.COMPUTER SYSTEMS APPLICATIONS,2014,23(9):162-166
凌海风,张军,张洋,彭永飞.装备战时基地级维修作业分工优化.计算机系统应用,2014,23(9):162-166
LING Hai-Feng,ZHANG Jun,ZHANG Yang,PENG Yong-Fei.Equipment in Wartime Depot-Level Maintenance Operations Optimization of Division of Labour.COMPUTER SYSTEMS APPLICATIONS,2014,23(9):162-166