中文摘要: 提出一种新的软件项目风险管理方法,采用贝叶斯网络同时对风险发生概率和风险影响进行推理。该风险管理方法能够随着软件项目的进行持续地评估潜在风险,并采取适当的措施应对风险。实践证明,在软件开发过程中引入该风险管理方法能够有效地对风险进行管理,提高软件开发的成功率。
Abstract:A new method of software project risk mangement is presented, which uses the Bayesian networks to infer the probability of risk occurrence and the impact of risk simultaneously. The method can assess risks continuously and take proper measures to respond to risks during software project. Practice proves that by introducing this method into software development process, project risks will be well-managed and project success rate will be improved.
文章编号: 中图分类号: 文献标志码:
基金项目:
引用文本:
李天纵,王强.一种基于贝叶斯网络的软件项目风险管理方法.计算机系统应用,2011,20(2):226-229
LI Tian-Zong,WANG Qiang.A Method of Software Project Risk Management Based on Bayesian Networks.COMPUTER SYSTEMS APPLICATIONS,2011,20(2):226-229
李天纵,王强.一种基于贝叶斯网络的软件项目风险管理方法.计算机系统应用,2011,20(2):226-229
LI Tian-Zong,WANG Qiang.A Method of Software Project Risk Management Based on Bayesian Networks.COMPUTER SYSTEMS APPLICATIONS,2011,20(2):226-229