Train Scheduling Problem Based on Two-echelons Algorithm
CSTR:
Author:
Affiliation:

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    Considering the impact of sudden railway damage on train operation, a single-track railway scheduling model is built on the basis of the train operation scheduling theory, and a two-echelon train scheduling algorithm with emergency handling capacity is designed. In the first stage, the running speed of the train in the section is adjusted, and in the second stage, the dwell time of the train is adjusted. Three effective search operators, an adaptive update rule and particle swarm optimization algorithm are combined to solve the single track railway train scheduling problem with the train delay rate as the optimization objective. The proposed algorithm is tested and compared with other algorithms under the same experimental conditions, and the emergency test proves the effectiveness of the proposed algorithm.

    Reference
    Related
    Cited by
Get Citation

李晓辉,刘元东,赵毅,董媛.基于两阶段算法的列车调度问题.计算机系统应用,2022,31(11):282-289

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:March 10,2022
  • Revised:April 07,2022
  • Adopted:
  • Online: November 02,2022
  • Published:
Article QR Code
You are the firstVisitors
Copyright: Institute of Software, Chinese Academy of Sciences Beijing ICP No. 05046678-3
Address:4# South Fourth Street, Zhongguancun,Haidian, Beijing,Postal Code:100190
Phone:010-62661041 Fax: Email:csa (a) iscas.ac.cn
Technical Support:Beijing Qinyun Technology Development Co., Ltd.

Beijing Public Network Security No. 11040202500063