Collaborative Task Scheduling Strategy for Mobile Edge Computing in Dam Monitoring
CSTR:
Author:
Affiliation:

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    Concerning the real-time monitoring problem of warping dams in northwest China, this work studies the scheduling method of warping dam monitoring and early warning tasks. To avoid the delay in discovering the hidden trouble of warping dams and improve the timeliness of the warning system, this study considers the average waiting time from task unloading to edge servers and proposes a collaborative task scheduling method based on edge computing in warping dam monitoring. A task completion time model is built according to the task computation, computing power of edge servers, and other information. Then, a simulated annealing algorithm is used to optimize the unloading position of computing tasks. A task scheduling strategy is designed in which multiple edge computing servers cooperate. Experimental results show that this method can greatly reduce the calculation time of monitoring tasks and improve the timeliness of monitoring and early warning.

    Reference
    Related
    Cited by
Get Citation

章新川,胡炜,王怀军,安洋,李军怀.淤地坝监测场景下边缘计算协作式任务调度方法.计算机系统应用,2021,30(9):271-278

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:December 15,2020
  • Revised:January 18,2021
  • Adopted:
  • Online: September 04,2021
  • Published:
Article QR Code
You are the firstVisitors
Copyright: Institute of Software, Chinese Academy of Sciences Beijing ICP No. 05046678-3
Address:4# South Fourth Street, Zhongguancun,Haidian, Beijing,Postal Code:100190
Phone:010-62661041 Fax: Email:csa (a) iscas.ac.cn
Technical Support:Beijing Qinyun Technology Development Co., Ltd.

Beijing Public Network Security No. 11040202500063