Computer Aided Tower Crane Planning System Based on Revit Platform
CSTR:
Author:
  • Article
  • | |
  • Metrics
  • |
  • Reference [10]
  • |
  • Related [20]
  • | | |
  • Comments
    Abstract:

    The layout of tower cranes directly affects the construction efficiency and construction cost in super high-rise buildings. This study combines the BIM technology with the expertise of tower crane planning, constructs the Revit parameterization family of the tower crane, defines the structural parameters and performance parameters of the tower crane family, and develops the computer aided tower crane planning system using Revit's API. Finally, the function of tower crane model management, tower crane quantity estimation, tower crane layout and auxiliary positioning has been realized. The system provides three-dimensional auxiliary tools for super high-rise construction tower crane planning, which frees designers from abstract drawing, improves efficiency, and reduces planning errors.

    Reference
    [1] 潘伟杰. 某超高层建筑施工策划阶段的关键问题研究[硕士学位论文]. 广州:华南理工大学, 2011.
    [2] 任琦鹏, 郭红领. 面向虚拟施工的BIM模型组织与优化. 图学学报, 2015, 36(2):289-297.[doi:10.3969/j.issn.2095-302X.2015.02.024
    [3] 王茹, 黄鑫. 基于BIM的运维阶段设备构件预警管理系统研究. 计算机工程与应用, 2017, 53(19):231-235, 240.[doi:10.3778/j.issn.1002-8331.1612-0512
    [4] 陈远, 康虹. 基于Revit二次开发的PC建筑预制率计算方法研究. 土木建筑工程信息技术, 2018, 10(4):12-16.[doi:10.16670/j.cnki.cn11-5823/tu.2018.04.03
    [5] Aziz ND, Nawawi AH, Ariff NRM. ICT evolution in Facilities Management (FM):Building Information Modelling (BIM) as the latest technology. Procedia-Social and Behavioral Sciences, 2016, 234:363-371.[doi:10.1016/j.sbspro.2016.10.253
    [6] 向晖, 吴延凯, 马庆吉, 等. 基于BIM技术的塔式起重机空间定位及选型. 施工技术, 2017, 46(S2):1236-1239
    [7] 辛明珠. 基于BIM技术的塔吊布置规划研究[硕士学位论文]. 重庆:重庆大学, 2018.
    [8] Wang J, Zhang XD, Shou WC, et al. A BIM-based approach for automated tower crane layout planning. Automation in Construction, 2015, 59:168-178.[doi:10.1016/j.autcon.2015.05.006
    [9] Ji YS, Leite F. Automated tower crane planning:Leveraging 4-dimensional BIM and rule-based checking. Automation in Construction, 2018, 93:78-90.[doi:10.1016/j.autcon.2018.05.003
    [10] Lien LC, Cheng MY. Particle bee algorithm for tower crane layout with material quantity supply and demand optimization. Automation in Construction, 2014, 45:25-32.[doi:10.1016/j.autcon.2014.05.002
    Cited by
    Comments
    Comments
    分享到微博
    Submit
Get Citation

杨静,张育飞,刘栋,徐苍博. Revit下计算机辅助塔机规划系统.计算机系统应用,2020,29(2):107-111

Copy
Share
Article Metrics
  • Abstract:1511
  • PDF: 2266
  • HTML: 1305
  • Cited by: 0
History
  • Received:June 26,2019
  • Revised:July 16,2019
  • Online: January 16,2020
  • Published: February 15,2020
Article QR Code
You are the first990805Visitors
Copyright: Institute of Software, Chinese Academy of Sciences Beijing ICP No. 05046678-3
Address:4# South Fourth Street, Zhongguancun,Haidian, Beijing,Postal Code:100190
Phone:010-62661041 Fax: Email:csa (a) iscas.ac.cn
Technical Support:Beijing Qinyun Technology Development Co., Ltd.

Beijing Public Network Security No. 11040202500063