Backup Resource Allocation Approach for the Electric Power Optical Network Based on Failure Group Separation
CSTR:
Author:
Affiliation:

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    In order to ensure the reliability of the remote dispatching network and improve the utilization efficiency of optical cable network resource, this paper presents a resource allocation approach based on fault link group separation to solve the problem of high resource cost and block probability of shared Backup Path Protection approach. In the construction of protection channel, management of protected resources can be allocated according to the formation of the resource link group. It utilizes the main routing and alternate routing tag to improve the utilization efficiency of backup channel, realizing the saving of the main working route resource. Finally, the proposed method is verified under different network simulation scenario, and the performance is also analyzed in theory.

    Reference
    Related
    Cited by
Get Citation

陈永卫,向志敏,李中,郭利花.基于故障链路资源分离的电力光缆备用路由资源配置方法.计算机系统应用,2017,26(6):221-226

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:October 11,2016
  • Revised:December 05,2016
  • Adopted:
  • Online: June 08,2017
  • Published:
Article QR Code
You are the firstVisitors
Copyright: Institute of Software, Chinese Academy of Sciences Beijing ICP No. 05046678-3
Address:4# South Fourth Street, Zhongguancun,Haidian, Beijing,Postal Code:100190
Phone:010-62661041 Fax: Email:csa (a) iscas.ac.cn
Technical Support:Beijing Qinyun Technology Development Co., Ltd.

Beijing Public Network Security No. 11040202500063