Runway Layout Comparison of Beijing New Airport
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    The Beijing new airport project is developed to satisfy the aviation demand of Beijing area. There are 4 runways in the new airport, as well as two alternative programs in the present period, which are called “3+1” and “4+0” to differentiate. Through macro analysis from airport administration, air traffic control and airlines, the evaluation system for choices of alternative program is established, which includes runway capacity, ground taxing time and delays. Then, the theory runway capacity is estimated. After the analysis of these, this paper builds the separate model based on the Simmod software. The “3+1” program is a better option based on the simulating models and the evaluation system. Besides, the conclusion could give theoretical reference to research for the runway layout comparison of Beijing new airport.

    Reference
    Related
    Cited by
Get Citation

王涛波,高伟.北京新机场跑道构型设计方案比较.计算机系统应用,2014,23(1):93-97

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:June 13,2013
  • Revised:September 02,2013
  • Adopted:
  • Online: January 26,2014
  • Published:
Article QR Code
You are the firstVisitors
Copyright: Institute of Software, Chinese Academy of Sciences Beijing ICP No. 05046678-3
Address:4# South Fourth Street, Zhongguancun,Haidian, Beijing,Postal Code:100190
Phone:010-62661041 Fax: Email:csa (a) iscas.ac.cn
Technical Support:Beijing Qinyun Technology Development Co., Ltd.

Beijing Public Network Security No. 11040202500063