Optimization of Construction Time-cost Management in Fuzzy Network Planning
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    Estimating the time of projects in the engineering project management involves some sort of imprecision. Traditional network planning methods cannot solve problems of uncertainty. Based on fuzzy set theory, an analysis of the uncertainty is made in this paper. Triangular fuzzy number is introduced to the project duration analysis, and subjectd degree function of dutation is given. An optimal construction time-cost trade-off method integrating fuzzy theory and genetic algorithms (GAs) is proposed in this paper. A fuzzy model for optimizing the fuzzy network on time-cost is established. Experimental results indicate that the method of fuzzy network planning of time-cost optimization of a certain degree of flexibility and adaptability.

    Reference
    Related
    Cited by
Get Citation

张宏国,苏鸣鸣.模糊网络计划工期成本优化方法.计算机系统应用,2011,20(9):54-58

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:December 23,2010
  • Revised:April 02,2011
  • Adopted:
  • Online:
  • Published:
Article QR Code
You are the firstVisitors
Copyright: Institute of Software, Chinese Academy of Sciences Beijing ICP No. 05046678-3
Address:4# South Fourth Street, Zhongguancun,Haidian, Beijing,Postal Code:100190
Phone:010-62661041 Fax: Email:csa (a) iscas.ac.cn
Technical Support:Beijing Qinyun Technology Development Co., Ltd.

Beijing Public Network Security No. 11040202500063