多时态统一电网模型
DOI:
CSTR:
作者:
作者单位:

作者简介:

通讯作者:

中图分类号:

基金项目:


Temporal Unified Power Grid Model
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    电网生产过程中对电网资源的管理精细化、规范化管理提出了进一步要求, 亟需建成国网公司电网横向和纵向的“一张网”. 以电网图数一体化建模为基础, 从多时态统一版本角度出发, 分析灵活的设备、拓扑以及图形版本管理的机制, 为电网资源的图数一致性与完整性提供了保障.

    Abstract:

    In the production process of power grid, power grid resource management and standardized management have been put forward further requirements, it's need to build national network grid and horizontal and vertical into "ONE NET". This paper is based on the grid graph and data integration model, starting from the multi temporal unified version angle, analysising the management mechanism of flexible devices, topology and graph version, providing the safeguard for the power grid resource's graph and data consistency and integrity.

    参考文献
    相似文献
    引证文献
引用本文

吴淑玮,闫训超,郭宝,郑浩泉.多时态统一电网模型.计算机系统应用,2015,24(2):244-247

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:2013-09-29
  • 最后修改日期:2014-09-19
  • 录用日期:
  • 在线发布日期: 2015-03-04
  • 出版日期:
文章二维码
您是第位访问者
版权所有:中国科学院软件研究所 京ICP备05046678号-3
地址:北京海淀区中关村南四街4号 中科院软件园区 7号楼305房间,邮政编码:100190
电话:010-62661041 传真: Email:csa (a) iscas.ac.cn
技术支持:北京勤云科技发展有限公司

京公网安备 11040202500063号